In safety-critical domains, training is a socio-technical infrastructure (spaces, interfaces, procedures, and preparation, execution, and final review phases) that supports learning and the development of a safety culture. From this perspective, the paper proposes an operational framework for Designer-in-the-Loop (DITL) to introduce Human State Monitoring Systems (HSMS) into maritime training, making the trade-offs between digital innovation and surveillance-related risks, such as bias and inequality, explicit and verifiable. Within this framework, On Watch is adopted as a case study, enabling operational testing in a concrete application context by integrating multimodal signals and translating them into non-prescriptive probabilistic indicators, without rankings or automated decision-making, in support of the final review phase. A pilot experiment, structured across three contexts – ECDIS, cooperative bridge, and interview – evaluates feasibility, usefulness, and acceptability through replicable technical-operational and socio-distributive key performance indicators.
Human state monitoring in maritime training – The On Watch case
Zignego, Mario Ivan;Bertirotti, Alessandro;Gemelli, Paolo;Pagani, Laura
2026-01-01
Abstract
In safety-critical domains, training is a socio-technical infrastructure (spaces, interfaces, procedures, and preparation, execution, and final review phases) that supports learning and the development of a safety culture. From this perspective, the paper proposes an operational framework for Designer-in-the-Loop (DITL) to introduce Human State Monitoring Systems (HSMS) into maritime training, making the trade-offs between digital innovation and surveillance-related risks, such as bias and inequality, explicit and verifiable. Within this framework, On Watch is adopted as a case study, enabling operational testing in a concrete application context by integrating multimodal signals and translating them into non-prescriptive probabilistic indicators, without rankings or automated decision-making, in support of the final review phase. A pilot experiment, structured across three contexts – ECDIS, cooperative bridge, and interview – evaluates feasibility, usefulness, and acceptability through replicable technical-operational and socio-distributive key performance indicators.| File | Dimensione | Formato | |
|---|---|---|---|
|
30_P17_ZIGNEGO.pdf
accesso aperto
Tipologia:
Documento in versione editoriale
Dimensione
6.1 MB
Formato
Adobe PDF
|
6.1 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.



